A good project begins with the right questions. Here is what to expect when planning a commercial touchless door installation or retrofit.

Survey clipboard and measuring tools beside a commercial doorway
A closer look before the scope is set. Concept imagery.
Step 01

Assess the opening

Start with the facility address, opening type, existing operator and functional need. Identify whether the enquiry is for new work, a retrofit, a washroom or a fault. The initial review determines what information is missing and whether a site visit is needed.

Step 02

Define the scope

Document equipment, control interfaces and work by other trades. Identify professional design, permit or inspection responsibilities where required. Pricing should distinguish the agreed work, assumptions and any exclusions; a sensor price is not a complete project quote.

Step 03

Plan the installation

Agree access hours, tenant or staff notices, power coordination and appropriate routes during the work. Confirm equipment and service availability for each address. Site-specific conditions and additional findings can affect timing and scope.

Step 04

Verify & hand over

Verify the agreed operating modes and interfaces, including relevant locking, indication and safety functions. Record equipment and outstanding items. Explain the intended controls and who to contact for service; assistance signalling also needs a facility response procedure.